13m Wide Dragline Boom Section

To date, this is one of the most high pressure projects we have ever undertaken.

​

A major incident took out a dragline boom on of our clients mine sites.


This meant we were tasked with getting a brand new 13m wide piece of equipment out of industrial Johannesburg and onto the mine site as quickly as possible.


No easy feat considering the average road width was 7.0m.

​

We were working against the clock on this one because each day the mine was out of operation cost them on average of $1 million.


No pressure!

​

We moved mountains (and a tremendous amount of street furniture) to get this job done but we did it!


As always, we delivered on our promise to client!

m05_resized.jpg

13m Wide Dragline Boom Section

To date, this is one of the most high pressure projects we have ever undertaken.

​

A major incident took out a dragline boom on of our clients mine sites.

 

This meant we were tasked with getting a brand new 13m wide piece of equipment out of industrial Johannesburg and onto the mine site as quickly as possible.

 

No easy feat considering the average road width was 7.0m.

​

We were working against the clock on this one because each day the mine was out of operation cost them on average of $1 million.

 

No pressure!

​

We moved mountains (and a tremendous amount of street furniture) to get this job done but we did it!

 

As always, we delivered on our promise to client!